Inspections

All work for which a permit is issued requires at least one inspection.  Most projects will require multiple inspections as determined by the scope of work performed.

          Basic Inspection Guidelines

          Inspection Procedures ~ New

          Roofing Inspection Guidelines

          Viewing Inspections Results Online

Scheduling Inspections

Inspections are made by calling the Inspector identified on your permit between 7:30 and 8:30 a.m on the day you wish to have your inspection.  You will need to be able to provide the inspector with:

          1.   The Job Address

          2.   The Permit Number(s)

          3.   The type of work completed that will be ready for inspection

          4.   Your contact information (name and phone number)

Don’t have a copy of the permit?  Download it today from our Online Permit System!

Contractors that have registered for an Online Permit System account may schedule inspections for the next business day.  This guide sheet can walk you through the process:

Scheduling Inspections Online


Inspector Area Maps

The following inspector area maps identify the districts each inspector is assigned to.  Please call the inspector assigned to your area when scheduling inspections or for Inspection/Code related questions.

Building & Plumbing Inspector Area Map

Electrical & Mechanical Inspector Area Map